Getting It Right The First Time Quality Control in Construction

Nov/24/2026

Thirty years on commercial, low, medium and high-end residential building sites have taught
me one thing: rework is the most expensive work you will ever pay for. Tearing out a wall,
recasting a slab or failing an inspection costs time, money and reputation. Good quality control
means getting it right the first time.


In Cayman, that starts with being familiar with and adhering to the building code. Every trade 
must build to the approved drawings and in accordance with the Building Code Regulations 
(2022 Revision), enforced by the Department of Planning’s Building Control Unit. Inspections
confirm good work, not discover bad work.

The steps in the Quality Control process should include:

1. Review drawings, specifications and code requirements before mobilizing and resolve conf licts through RFIs.
2. Prepare a Quality Plan and Inspection & Test Plan with established sequence and timing to immediately precede the Building Control inspection schedule.
3. Have submittals, samples & mock-ups approved by the designers before ordering.
4. Hold a pre-start meeting with each trade to agree the standard of work.
5. Check materials on delivery. Reject what does not comply.
6. Inspect every stage in-house before calling Building Control or the Special Inspector.
7. Record, fix and close out defects quickly.
8. Keep photos, test results and sign-offs for handover.

Quality is not one person's job. It is everyone's, every day. It should not be optional or subjective but an established standard to be applied, without prejudice, across the entire project.